29. A Planning Step Reopens When Its Acceptance Is Unmet

Date: 2026-10-17

Status

Accepted. Amends ADR-0025 decisions 2 and 3.

Context

ADR-0025 froze planning/routing.json: the overlay changes only to mark an open step done, with the pull request as evidence. It did not provide for the opposite case.

step-nucleus-contract was marked done on 2026-09-15 with evidence that names only imago-side code: the pkg/kernel decoder and verifier, the imago kernel CLI and sync-kernel-manifest.yml. Issue #47 shows that the contract has never been crossed. The workflows could not start, versions.json kernel.streams is empty, and no nucleus release has been verified against the contract. planning/TODO.md lists the contract as open. A graph that states done while the acceptance is unmet tells a reader the opposite of the forge.

The overlay had also fallen behind in the direction ADR-0025 allows. Issues #80 and #81 closed on 2026-10-17, while step-lefthook-verify and step-app-hardening still read open. No test compared the overlay with the table of carried steps in docs/tools/planning-graph.md.

Decision

  1. A step whose acceptance is unmet is reopened. Its done field becomes false. Its evidence keeps what was delivered, states what is missing, and names the issue that carries it. No step is added. The graph stays a frozen record in every other respect. The maintainer decided this on 2026-10-17 (paraphrased: the graph stays honest rather than convenient; the step reads open until the first nucleus release crossing the contract is verified).
  2. step-nucleus-contract is carried by #47. It closes when a nucleus release crosses the contract and imago verifies it.
  3. The overlay and the documentation agree by test. tests/test_planning_overlay.py fails in three cases: an open step names no carrying issue, the table in docs/tools/planning-graph.md lists other open steps or other issues than the overlay, or the done count in that file differs from the overlay.

Consequences

  • Positive: the overlay states the same open work as the forge. step-lefthook-verify and step-app-hardening are done with their pull requests as evidence, and the reopened step names its issue.
  • Positive: a step marked done or reopened in one file without the other fails the test suite.
  • Negative: the test cannot see whether a carrying issue has closed, because the forge is not reachable offline. A closed issue whose step still reads open is caught only when the overlay is next edited, or by a reader.
  • Neutral: imago plan route now lists step-nucleus-contract among the open steps. It has needs_external_contract, so the router ranks it behind local work.

References

  • ADR-0021: the kernel artifact contract with cordanaLLM/nucleus.
  • ADR-0025: the frozen planning graph.
  • Fleet answer ledger, id imago-47-nucleus-step, 2026-10-17: reopen the step (paraphrased).